Chris Luetchford – Project Planner SUMMARY OF EXPERIENCE Over
eight years of Project Controls experience in the Engineering and
Construction industry, working in the areas of offshore and onshore Oil
Exploration and Production. Assignments include; Owners representative,
Construction Field Planner/Scheduler, outage maintenance scheduler, all with
the goal of improving the overall efficiency of the work process, monitoring
productivity and meeting intermediate and completion project milestones to
achieve a project that is on time and within budget. PROFESSIONAL EXPERIENCE: DRL Engineering – Business Development Jul
2014 – Present
Murphy Oil - Congo, Africa
Aug-2013 – Jul 2014 De-commissioning
of an FDPSO & Plug and Abandonment of 12 wells in Congo West Africa. Combined
construction activities into one master schedule looking for schedule impacts
against project (WBS) milestones. Resource loaded schedule to show manpower
overvaluations. Levelized and smoothed resources to reduce impacts. Ran look
ahead reports for Management for weekly meeting updates. Developed reports
for showing delays, work arounds to improve Decommissioning and modifications
for recovery of delayed work. Schedule was developed using Microsoft Project. Hess Corporation, North Dakota
Feb-2013 – Aug 2013
lead
project scheduler for Hess Corporation at their $900+ million gas plant
expansion in Tioga, ND. Upon arrival in February of 2013, there were minimal
project controls measures in place. Helped integrate 8 contractor schedules
into a single IMS, along with implementing weekly reporting standards to
include overall progress, manpower/man-hours, and commodity tracking. Noble Energy,
Houston
May-2012 – Feb-2012
Project
Planner / Scheduler for the FEED development of the field and deepwater host
FPSO to handle 1 BCF/Day production. Studies included Hull Selection, Mooring
& Riser Systems, Dynamic Simulations, Process Selection, Contract
Strategy and ITT Tender Package Preparation of a level 3 resources loaded
Schedule using P6. DCP
Midstream LLC,
Houston
Oct 2009 – May 2012 Upgrade expansion of Raywood Cryogenic Gas Plant
– Texas, USA Preparation
of a level 3 resource loaded Schedule and Cost Estimating Model For
the expansion of a cryogenic gas plant. The Cost Model incorporated quantities
estimated and associated current cost norms for construction and supply
of bulk materials. Turnaround Manager – Raywood Gas Plant
- DCP Midstream, Texas Turnaround
Manager of a 3 plant Cryogenic Gas Plant, including the development of a
level 3 schedule and cost tracking. Responsibility included JSA safety
meetings, coordination of onsite activities and recording/reporting daily
activities to management. Gulf Plains Gas Plant – Turnaround – DCP
Midstream Texas Built
a WBS structure for Plant Maintains activities to get proper Earned Value
(EV). Worked with financial group for development of reports for Sr.
management. Developed resource loaded schedules. Schedules include
engineering, manufacturing, installation and commissioning of equipment.
Developed critical path method CPM) based on critical milestones or anchor
milestones of the project. Worked with the outage/daily scheduling groups for
proper work windows for tie-ins and installation of equipment being modified
or replaced. Developed special reports for supervisors/management for
recovery plans using 6.0/6.2/6.7 Primavera software. Mobile Bay Gas Plant-
Turnaround-DCP Midstream-AL
Scheduler & Cost Engineer
- Redevelopment of MP225-A GOM Platform
Job
Responsibilities: ·
Responsible
for development of schedule, and estimate to complete data for assigned task
under the direction of a lead project controls. ·
Creation of
Work Breakdown Structure (WBS) and development of schedules for those WBS. ·
Analyze
schedule progress and performance and identify development areas. ·
Assemble and
compile schedule and input them into the project control database and provide
output to the project team. ·
Participate
in claim analysis and negotiation. ·
Analyze
critical path and restraints to determine the effect of changes to the
schedule recommend work-around ·
Management
techniques to gauge progress and identify performance variances. ·
Advise
management of risks that may affect project schedules and client Relations. ·
Development
and maintenance of any periodic (daily, weekly, monthly) Status reports to
keep management and/or owner informed on project progress. These reports may
include schedule status, and earned value curves reports on either direct or
indirect construction activities that are a part of the work. EDUCATION University of
Houston, Houston TX - Construction Management Primavera P6 School
Certified Computer Literacy
·
Highly proficient with Primavera P6, Microsoft
Project, Word, Excel, PowerPoint, Office Project, Adobe Acrobat Pro. 1 Luetchford, Chris |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|